Chengu Smart Center
Project location: Chengdu City, Sichua
Installed Capacity: 270kW
Project Type: Wall BAPC
Time to Grid Connection: September 2018
Zhangjiakou Civic Center
Project location: Zhangjiakou City, Hebei
Installed Capacity: 92kW
Project Type: Wall BIPV
Time to Grid Connection: December 2019
Smart Energy E-commerce Building in Ruichang
Project location: Ruichang City, Jiangxi
Installed Capacity: 534kW
Project Type: BIPV
Time to Grid Connection: December 2020
CNBM (Handan)
Project location: Handan City, Hebei
Installed Capacity: 500kW
Project Type: Structural curtain wall BIPV
Time to Grid Connection: September 2020
Prefabricated Villa in Dingan County, Hainan Province
Project location: Dingan County, Hainan
Installed Capacity: 6.3kW
Project Type: Rooftop BAPV
Time to Grid Connection: July 2018